Curtain Wall of PVDF Spray Painting Aluminium Sheet
Basic Info.
Model NO. | YT-CW-004 |
Supporting Construction | Frame Type |
Number of Layers | Double |
Metal Curtain Wall Kind | Aluminum Panel Curtain Wall |
Shape | Standard Plane |
Usage | Exterior Wall |
Sample | Can Be Customized |
Thickness | 0.2mm-3.0mm |
Processing Service | Bending, Decoiling, Cutting |
Delivery | 7-25 Days |
Width | 40mm-1600mm |
Coating | PVDF, PE |
Aluminum Alloy | 1100, 3003, 3004 |
Transport Package | in Bulk or in Wooden Case |
Specification | Customization |
Trademark | YATAI |
Origin | Shandong |
HS Code | 7606125000 |
Production Capacity | 100000/Year |
Product Description
Building Decoration Material Prepainted Color Coated Aluminum Coils/Sheet/Panel
Product Specification
Products Name | Aluminum Solid panel/sheet |
Thickness | 2.0mm, 2.5mm, 3.0mm( according your detail drawings) |
Width | according your detail drawings |
Length | according your detail drawings |
Surface finishing | PVDF coating/ PE coating |
Shape | Regular or any shape we can do upon the CAD drawing |
Color | Solid color, Metallic Color, Wooden/Stone Color or customized |
Application | 1. For the curtain wall, both outer-side and inner-side/Ceiling2. Underground/Airport/Bus station/Railway station, etc3. Office building/Shopping mall/Hotel/Restaurant/School/Hospital/ Meeting room, etc4. Handrail/Column/Lobby/Corridor, etc5. Kitchen/bathroom/living room/office/shopping mal/conference room/laboratory/exhibition hall, etc |
Warranty | More than 8~25 Years based on different coating |
Color Code:Solid color as per RAL Code, wood color, marble color, or customized
Product Applicattion
We provide cutting processing service, can offer you aluminum sheet for curtain wall panel, aluminum homeycomb panel,aluminum ceiling,aluminum rectangular tube, aluminum core composite panels, corrugated sheet etc.The Roll coated aluminum coil can use for construction like railway, roller shutter, curtain walls, signs, balconies, facades, roofing, ceiling, curtain wall, rain gutter for the villa,hotel,hospital,airport,measume,sport stadiums,industry factory etc.
Quality Control
We have strict quality control process from the raw coil material to finished color coated aluminum coils, make sure the quality can match the export standard.Company Profile
Shandong Yatai,was founded in 2012,covering an built-up area of more than 150,000 square meters, with a construction area of about 57,000 square meters and a total investment of RMB 285 million.We have 8 large-scale coating production lines, with annual production capacity reaching more than 100,000 tons, as well as supporting Straightening line, slitting, cross-cutting, embossing bending and other equipment.Yatai can offer you:1.Guaranteed quality: standard tests are in line with GB/T23443-2009 national standards, The aluminum material adopts the world- renowned Northeast China Aluminum Light Alloy Aluminum materials; the coating and paint have reached strategic cooperation with well-known industrial coating companies, such as PPG, Akozo Nobel, and Valspar. 2.Fast delivery and production time: 7days, The company has 8 large-scale coating production lines, as well as supporting Kaiping,slitting, cross-cutting, embossing bending and other equipment, with an annual production capacity of 100,000 tons3.Custom sample production: 3 days4.Thickness 0.21mm-3.0mm, width 600mm-1600mm, Alloy 3003,3004,3105 etc.We always pursued the core value of customer first, and strictly control each production process with high standards for ten years. Customers create the highest quality and high standard products
Packaging & Shipping
1)Packaging Detail:
Plate/coil is placed to the iron or wooden pallet ,wrapped by water-proof craft paper perfectly , then fixed by iron narrow belt well .
2)Port:Qingdao port or other main port in China
3)Container:20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High) , loading 18~25 tons .
40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High) , loading 20~28 tons.
FAQ
1. Q: What is your minimum order quantity?
A: Usually a container (22-25 tons),The product is different. The minimum quantity is not the same.2
Q: What is your packaging method?
A: Bundle or bulk (according to your requirements).3
Q: What is your payment method?
A: Wire transfer 30%. The margin before loading is 70%.4
Q: When is your delivery time?
A: Within 7-25 working days after receiving the deposit.5. Q: Are you a manufacturer or a trader?
A: We have been a manufacturer of building materials for more than 20 years.6
Q: Where is your factory?
A: Our factory is located in Linyi,shandong province, with sufficient production capacity and early delivery time.7. Q: Can we visit your factory?
A: A warm welcome. Contact us when you come to visit.
"COATING THE WORLD,MADE THE WORLD SAFER AND MORE BEAUTIFUL!"